Show
Designed Capacity Reached

The target reached of Xinhai EPC includes expected recovery rate reached, design capacity for clients reached, the quality of product reached, consu??

More +
Personnel Training

It is simultaneous for worker training and installation & commission in order to save time and cost. Worker training has two purposes, one is to??

More +
Installation and Commission

I The Importance of Installation and Commission Installation & commission is key link of realizing dressing test, mine design, and equipment man??

More +
Equipment Manufacture

Equipment manufacture is in the charge of Xinhai mine production plants that covers an area of 100 mu, and are divided into 3 production plants. It ??

More +
Mine Design

Three parts of mine design: feasibility study, preliminary design and construction plan The key of mine design is all must be established on the bas??

More +
Mineral Dressing Test

Mineral dressing test is in the charge of Mineral Dressing Research Institute belonging to Xinhai Company. I Preparation before test The clients sho??

More +
Engineering Consulting

I Purpose of Engineering Consulting Engineering consulting makes clients have a comprehensive understanding of the value of mine, the useful element??

More +
Mineral Processing EPC

One of Xinhai EPC cases: Vietnam Carat 800t/d graphite plant Xinhai EPC provides services of sample test, mine design, equipment manufacture, etc.??

More +